
Detail and Production Engineering.
Engineering work in the stern and bow steel areas for the double-end Ro-Ro Ferry (C-344) of THE ROYAL TESO N.V.

Detail Engineering of Structural Steel and Outfitting.
Block work of 46,500 m³. Development of pipe storage module for dredging on the FALL & PIPE vessel (C-340) for the company JAN DE NUL.

Basic Engineering of Structure and Outfitting.
Design of piping schemes, form input and fairing in FORAN, and full development of the Stand-By Vessel (C-602) for oil operations assistance and rescue of castaways (140 PAX) for the shipowner SVAGT.

Detail Engineering of Structures and Outfitting.
Work for the live fish transport vessel (C-414).

Detail Engineering of Structures and Outfitting.
Engineering work for the fishing research vessel (C-413).

Detail Engineering.
Work in the central and stern areas of an 18,000 AHTS vessel for GRUPO CBO (Brazil).

Detail Engineering of Structural Steel and Outfitting.
Work in the bow area for a 17,000 m³ dredger (C-346) for the company VAN OORD.

Detail Engineering of Steel.
Production support for implementing modifications on the Ro-Ro ferry (C-509 and C-510) for the company ACCIONA.